Currently an engineering team in China is quietly pouring over the Detraform model 500 design files to research feasibility and development costs. So far so good. I’m excited to learn the small size of the base station doesn’t appear to be a problem. We’re still pushing the engineers to come up with a plan for making the LCD screen invisible like you’ve seen in the concept photographs. We’re hoping to have a contract signed between all parties soon. Stay tuned.

Currently an engineering team in China is quietly pouring over the Detraform model 500 design files to research feasibility and development costs. So far so good.

I’m excited to learn the small size of the base station doesn’t appear to be a problem. We’re still pushing the engineers to come up with a plan for making the LCD screen invisible like you’ve seen in the concept photographs.

We’re hoping to have a contract signed between all parties soon. Stay tuned.